Posted in

How to test the performance of an Electric Pre – Plasticizing Injection Moulding Machine?

If you’ve ever stood on a production floor watching an injection moulding line, you know that a machine’s performance isn’t just about running parts—it’s about consistency, uptime, and the ability to hit exact specs even when production runs stretch into nights and weekends. As a supplier of electric pre-plasticizing injection moulding machines, I’ve fielded hundreds of calls from manufacturers struggling with underperforming equipment, and more often than not, the issue isn’t the machine itself—it’s how they’re testing it. Too many buyers rely on a quick demo run with pre-approved parts, missing key performance metrics that only show up in real, high-volume production. Today, I’m walking through the scientific, practical testing protocol we share with every client before they take delivery of our machines, so you can tell the difference between a machine that works for a week and one that will perform for years. Electric Pre-Plasticizing Injection Moulding Machine

First, let’s get one thing straight: testing an electric pre-plasticizing machine is not the same as testing a standard all-electric model. Our pre-plasticizing design uses a separate auxiliary plasticizing unit to melt resin before feeding it into the main injection barrel, which cuts down on cycle time and reduces shear stress on material—but that also adds two extra layers to test: the auxiliary unit’s melt quality and the synchronization between the two units. Too many testers skip this step and just measure overall cycle speed, which means they miss bottlenecks where the auxiliary unit slows down the whole line mid-run. We start with baseline performance testing before ever introducing production resin, because that eliminates material variables and lets us isolate how the machine itself is performing.

Phase 1: Static and Dynamic Energy Efficiency Testing
Electric machines are chosen over hydraulic ones for their lower energy use, but not all electric pre-plasticizing machines deliver on that promise. Hydraulic machines waste energy heating fluid and overcoming friction, but electric models can still vary wildly—especially if their motor sizing or control algorithms are poorly calibrated. To test this, we use a portable power analyzer that plugs into the machine’s main power supply, and we run three static tests and three dynamic tests over an 8-hour period.

Static testing is simple: we set the machine to idle (no mould movement, no injection, just the auxiliary unit holding a constant melt temperature) and measure power draw every minute for 60 minutes. A good electric pre-plasticizing machine should draw less than 15% of its maximum rated power at idle; anything higher means wasted energy from overheating motors or unnecessary power draw on the control system. For dynamic testing, we run 100 consecutive short cycles (10 seconds each) with an empty mould (no part produced) to mimic rapid idle between production runs, plus 50 long cycles (30 seconds each) for thick parts. We calculate energy per cycle by dividing total power used by number of cycles, and compare that to the machine’s advertised rating. In our 10 years as a supplier, we’ve seen cheap competitors advertise 0.2 kWh per cycle, only to deliver 0.4 kWh when tested—because their auxiliary motor is undersized, so it has to work harder to melt resin evenly. Our pre-plasticizing units are sized to match the main injection barrel, so we consistently deliver 0.18-0.22 kWh per cycle on average, which is 20% more efficient than many mid-tier all-electric models.

Phase 2: Melt Uniformity and Consistency Testing
This is the most critical test for plastic parts, because even a 1% variation in melt temperature or density can cause warping, flash, or dimensional defects that ruin entire production runs. With a pre-plasticizing machine, the auxiliary unit is responsible for melting resin, so this test is where we confirm that unit is working as intended. We use a temperature data logger with 5 probes embedded in the auxiliary barrel and another 5 in the main injection barrel, placed at different depths and locations, to measure temperature every 2 seconds over 200 consecutive production cycles. For a high-quality machine, temperature variation across all probes should be less than ±1°C. If it’s higher than that, you’ll get parts that are slightly different every cycle—for example, a part with thicker walls in one run and thinner walls in the next, even if all other settings are the same.

We also test volume consistency, because the auxiliary unit’s metering of resin into the main barrel has to be precise. We run 50 cycles, collecting the plastic shot (the amount of resin injected per cycle) after each run, and weigh each shot to within 0.01 grams. The standard deviation of these weights should be less than 0.5% of the average shot weight. That number might sound small, but for a 100g part, a 0.5g variation leads to noticeable changes in part hardness and shrinkage. We once had a client come to us after running a competitor’s pre-plasticizing machine, where their shot weight variation was 2.1%—they were scrapping 8% of parts monthly before we helped them recalibrate their auxiliary unit.

Phase 3: Cycle Time and Synchronization Testing
The whole point of a pre-plasticizing machine is to cut cycle time by plasticizing resin while the mould is cooling, right? But only if the synchronization between the auxiliary plasticizing cycle and the mould cycle is perfect. Poor synchronization means you’re either waiting for the auxiliary unit to finish melting before opening the mould, or you’re rushing the auxiliary unit, leading to inconsistent melt. To test this, we use a high-speed camera that records every cycle at 1,000 frames per second, paired with the machine’s built-in cycle timer. We measure three key timings: 1) time from mould closure to start of injection, 2) time from start of injection to end of auxiliary plasticizing, and 3) total cycle time over 500 consecutive runs.

A well-tuned electric pre-plasticizing machine should have a maximum cycle time variation of less than 0.2 seconds over 500 runs. If variation is higher than that, you’ll get bottlenecks where some cycles are longer than others, causing downstream issues like parts stacking unevenly on conveyors, or mould temperatures fluctuating more than they should. We also test cycle time vs. resin type, because some manufacturers run different resins in the same machine—we test with both PP and ABS (the two most common resins) to confirm that cycle time stays consistent regardless of material viscosity. On average, our machines run 15-20% faster than standard all-electric models for the same part, because the auxiliary unit’s parallel plasticizing eliminates the need to wait for the main barrel to heat fully before each injection.

Phase 4: Uptime and Reliability Testing
Even if a machine is efficient and consistent, it’s useless if it breaks down every other day. For our machines, we run a 72-hour continuous production test, running 800 cycles per hour (a moderate production load, not maxed out) to simulate a long weekend production run. We track two metrics: mean time between failures (MTBF) and mean time to repair (MTTR). For a industrial injection moulding machine, MTBF should be at least 1,000 hours, but we aim for 2,500 hours on our electric pre-plasticizing machines—partly because they have fewer moving parts than hydraulic machines, and partly because our control system alerts operators to small issues before they become failures.

During this test, we also track how long it takes to change over between part sizes, because changeover time is a huge driver of overall production efficiency. For pre-plasticizing machines, changing the auxiliary unit’s screw or barrel for a new part is a common task, and we design our machines with quick-connect fittings that let you swap components in less than 15 minutes, vs. 45 minutes on many competitors’ models. During our 72-hour test, we do three full changeovers, tracking time and any errors, to confirm that the design holds up under real conditions.

Common Mistakes We See in Performance Testing
Over the years, we’ve seen manufacturers test machines wrong so many times that they end up with a machine that looks good on paper but fails in their facility. The biggest mistake is testing with only one part size and one resin. For example, we had a client test a machine with a small thin part made of PP, which ran perfectly, then tried running a thick ABS part a month later and got 10% defect rates. Why? The auxiliary unit was sized for small shot weights, so when they ran a large shot, it couldn’t melt the thick ABS evenly. That’s why we always recommend testing with the exact part and resin the client will be using for production—generic demos are useless.

Another mistake is skipping real-world environment testing. If your production floor has ambient temperature fluctuations (say, 10°C between day and night), a machine that performs perfectly in a 22°C demo room will have melt temperature variation when run in your actual facility. We always run a final test in the client’s production space, not just our facility, because that’s where the machine will live.

So, What Should You Ask When Testing an Electric Pre-Plasticizing Machine?
If you’re testing machines for your facility, don’t just take the supplier’s word for the specs. Bring your resin and your mould, run the tests we outlined above, and ask for raw data: temperature logs, shot weight standard deviation, cycle time variation, and uptime numbers. Any reputable supplier will let you run these tests on-site or at their facility before you commit to a purchase. At our company, we offer free 3-day trial testing for every client, so you can take the machine, run your own parts, and confirm performance before you sign a contract.

At the end of the day, performance testing isn’t a checkbox—it’s how you make sure your production line is set up to be profitable. A few extra hours of testing before delivery can save you thousands in scrap parts, downtime, and repairs down the line. If you’re evaluating electric pre-plasticizing injection moulding machines and want to go beyond surface-level demos, we’re here to help. We can walk you through our full testing protocol, run a custom test with your materials and mould, or answer any questions you have about what to look for in a machine that will perform consistently for your production needs.

If you’d like to discuss testing your specific application, or learn more about how our electric pre-plasticizing injection moulding machines can improve your line’s performance, feel free to reach out to our team for a no-obligation consultation.

Plastic Mixer References

  1. Rosato, D. V., & Rosato, M. G. (2000). Injection Molding Handbook. Kluwer Academic Publishers.
  2. Harper, C. A. (2002). Modern Plastics Handbook. McGraw-Hill.
  3. International Organization for Standardization. (2018). ISO 20128: Plastics – Determination of Melt Flow Rate of Thermoplastics. ISO.
  4. American Society of Mechanical Engineers. (2020). ASME B19.1 – Material Weighing Systems – Performance Specifications. ASME.
  5. Rubber and Plastics Machinery Manufacturers Association. (2021). Guide to Testing and Performance Evaluation of Injection Molding Machines. RPMMA.

Ningbo Yalishi (Arlex) Plastic Machinery Co., Ltd.

Address: No.63, Huangsu East Road, Industrial Zone, Dongqian Lake Tourist Resort, Ningbo, Zhejiang Province
E-mail: leo@arlex.cn
WebSite: https://www.arleximm.com/