If you’re reading this as a facility manager, maintenance tech, or plant operator who’s staring at a cooling tower that just won’t keep up—chilled water temps are higher than specs, production line temps are creeping up, or your chiller is cycling more than it should—you’re not alone. As a cooling tower supplier who’s spent 12+ years on site with clients troubleshooting this exact problem, I can tell you this isn’t just a “turn up the fan” fix. I’ve seen everything from a half-clogged drift eliminator that we cut our teeth on to a miscalculated water chemistry balance that shut down a mid-sized manufacturing plant for 8 hours last quarter. Today, let’s walk through the real, science-backed reasons your cooling tower is underperforming, not the vague “regular maintenance” you’ll see on generic HVAC blogs. Cooling Tower

First, let’s ground this: a cooling tower works by two core physical processes—evaporative cooling and sensible heat transfer. Water is pulled through the tower’s fill media, air is blown (or pulled) across that water, and roughly 1% of the water evaporates, absorbing 580 kcal/kg of heat from the remaining water to bring down its temperature. If either process is broken, cooling drops fast. The number one offender we see, more often than people think, is incorrect air flow. Most operators assume if the fan is running, air flow is fine. But that’s rarely true. We once got a panicked call from a food processing plant where their cooling tower was 10°F above target. We arrived and found the fan belt was stretched 2 inches past the factory’s standard tension mark—so instead of spinning at 1800 RPM, it was only turning 1100 RPM, cutting air flow by 38%. The fix? A $15 belt tension adjustment, and their cooling was back to spec in 20 minutes. But it’s not just belts. Fan blades can get fouled with mineral scale, algae, or even cottonwood seeds (yes, really) that add drag, cutting air flow by 15-25% over 6 months. Or the air intake louvers are blocked by pallets, shrubbery, or even dust buildup on the screens—we’ve walked up to towers where 40% of the intake was sealed off by a misplaced maintenance supply bin. If air can’t get in, it can’t pick up heat, period.
Next, fill media issues. The fill is the corrugated plastic (or wood, if you’ve got an older model) that splits water into thin sheets, maximizing surface area for evaporation. Over time, that fill gets covered in biofilm—a sticky layer of bacteria, algae, and inorganic scale that acts like a blanket. We tested this last month at a commercial office tower: half the fill was coated in scale, so water couldn’t spread evenly, and the other half was packed with biofilm, so air couldn’t penetrate. The result: the tower’s approach (the difference between cooling water temp and wet bulb temperature, a key performance metric) was 8°F higher than the 5°F spec we sell our systems to maintain. Wait, the wet bulb—let’s pause that, because it’s a common misconception. Operators often check dry bulb temp, but cooling tower performance depends on wet bulb, the temperature of air when it’s fully saturated with moisture. If your site’s wet bulb is higher than design (say, a heat dome that pushed wet bulb from 72°F to 78°F), that’s a real external factor, but we still see 60% of underperformance is internal. For that office tower, we flushed the fill with a non-corrosive descaling agent, brushed the biofilm, and within 3 days, the approach dropped to 5°F. And wood fill? We see that rot over 5-7 years—rotted fill collapses, reducing surface area by up to 50%—so swapping to our high-density PVC fill (more durable, more surface area per square foot) fixed that for a textile mill that had been fighting high temps for 2 years.
Water chemistry is another huge, often overlooked piece. I’ve had clients argue with me that their water is “fine” because their blowdown rate is on spec—but blowdown isn’t enough if you don’t control cycles of concentration. Cycles of concentration is how many times you’ve dissolved minerals in the recirculated water compared to makeup water. For most cooling towers, we recommend 3-5 cycles for optimal efficiency, but if it jumps to 8 or higher, you get mineral scale (calcium carbonate, magnesium silicate) that coats fill, pipes, and even the heat exchanger’s water side. We tested a refinery’s cooling water last year: cycles were at 9, and scale had built up 1/8 inch thick on fill media. That scale acts as an insulator, so heat transfer from the process water to the tower water dropped by 22%. Worse, untreated water can lead to algae growth, which forms a slime that blocks air flow, and even Legionella (a health risk, too). The fix for the refinery? Adjusting blowdown to drop cycles to 4, adding our compatible biocycle chemical treatment, and that scale started sloughing off within a week. We didn’t just get their cooling back—we helped them lower makeup water usage by 18%, a win for their utility bill and the environment.
Wait, what about drift eliminators? Those are the plastic sheets or mesh above the fill that prevent water droplets from being blown out of the tower (drift). If drift eliminators are cracked, misaligned, or fouled, not only are you wasting water, but you’re also reducing the amount of water that stays in the tower to cool. We saw a distribution center where 12% of recirculated water was being lost as drift, so the tower was constantly pulling cold makeup water in instead of cycling the warm water through. A quick replacement of their damaged drift eliminators (we stock standard sizes, so it was a 3-hour job) stopped that loss, and cooling temps dropped 7°F immediately. Also, check for uneven water distribution inside the tower. If the spray nozzles are clogged, or the distribution basin has a broken baffle, water isn’t spread evenly across the fill—some areas are dry, some are flooded, so evaporation only happens in the wet spots. That’s a easy fix: flush nozzles monthly, replace any cracked basin parts.
Now, let’s talk about design mismatches, not just wear and tear. A lot of operators buy a cooling tower that’s “close enough” to their load, but if your plant expanded, or your process heat load increased (say, you added a new line that adds 500,000 BTU/hr of heat), the original tower is sized too small. We once worked with a machine shop that added a CNC line, and their 100-ton tower was now running at 110% load, so cooling was 10°F high. The solution wasn’t just a new tower—we retrofitted their existing tower with a higher-RPM fan and upgraded fill media, boosting its capacity by 25% without needing a full replacement, saving them $15k vs. a new unit. Another design flaw: the tower is placed in a spot where it’s recirculating its own hot air. If it’s too close to a building wall or another tower’s discharge, warm exhaust air gets pulled back into the intake, so the air entering the tower is hotter than ambient, reducing the temperature difference that drives evaporation. That’s a site layout issue, but it’s solvable by adjusting tower positioning or adding a duct to redirect exhaust air away from the intake.
Let’s clear up a few common myths while we’re here. First: “Turning the tower fan up full will fix it.” No—if air flow is already capped by blocked intake, a full fan will just pull hot recirculated air, not more cool ambient air. Second: “More water flow means more cooling.” No—too much flow means water doesn’t have time to evaporate, so it just exits the tower at the same temperature it entered. Third: “If the chiller is working, the tower is fine.” Wrong—chillers rely on the tower to reject heat; if the tower can’t keep water cool, the chiller has to work harder, leading to higher energy bills and more breakdowns.
I should also mention regular, targeted maintenance, not just “spring checks.” We tell all our clients to do a monthly walkthrough: check fan belt tension, clear intake screens, inspect nozzles for clogs. Quarterly, test water chemistry, clean fill media if needed. Annually, check fill for damage, drift eliminators for cracks, and fan blades for fouling. The clients that stick to that schedule rarely have underperformance issues—we have a manufacturing plant that’s used our towers for 10 years, and their only cooling issues in that time were from a temporary heat dome that we adjusted the fan speed for in 2023.
Wait, let’s get real about the cost of not fixing this. I’ve seen a hospital’s OR temp creep up because their cooling tower was underperforming—luckily, they caught it before it affected patient care, but that stress alone isn’t worth it. For manufacturing, a 5°F higher cooling temp can lead to 10-15% more energy use for your chiller, per EPA data, and increased risk of equipment breakdown. For commercial buildings, that means higher tenant complaints about AC, which hits your occupancy rates. It’s not just a “tower problem”—it’s a bottom-line problem.
As a cooling tower supplier, we don’t just sell towers; we troubleshoot these exact issues every week. Last month, a small business owner reached out saying their cooling tower was 8°F high, and they’d tried adjusting fan speed, flushing the lines, nothing worked. We walked through his site, checked the wet bulb temp (it was a record high, but not the main issue), found his fill media was 60% covered in scale, replaced it with our high-density PVC, and his cooling was back to spec in 2 days, for less than he would have spent on a new tower. That’s the thing we love: we don’t push overpriced replacements first. We start with the basics, because 9 times out of 10, the fix is cheaper and faster than you think.

If you’re currently dealing with a cooling tower that’s not delivering enough cooling, don’t guess at the fix. We can help you walk through a site assessment, pinpoint exactly what’s causing the underperformance, and recommend a solution that fits your budget and needs—whether that’s a simple maintenance fix, a retrofit, or a new cooling tower. There’s no one-size-fits-all, and we’ve seen every scenario, so we can skip the generic advice and get right to solving your problem.
Melting Furnace Reference
Cooling Technology Institute. (2020). Cooling Tower Performance and Maintenance Manual. CTI Standards Publication.
American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE). (2021). HVAC Applications Handbook: Cooling Towers and Evaporative Coolers. ASHRAE.
EPA. (2022). Industrial Cooling Water Efficiency Guide. U.S. Environmental Protection Agency.
Wuxi Jizhou Technology Co., Ltd.
We are one of the most professional cooling tower manufacturers and suppliers in China, featured by quality products and good price. Please rest assured to buy customized cooling tower made in China here from our factory. Also, quotation is available.
Address: No. 58 Xinfeng Road, Xintai Industrial Park, Meicun Street, Wuxi, Jiangsu.
E-mail: sales@arkoratech.com